Services

Permitting and Environmental Impact Statements

The permitting process for water projects is not simple, quick, or cheap.

A knowledgeable and pragmatic guide through the maze of red tape—or assistance in how to avoid it altogether—helps shape a project to be positioned for success. We have experience with large water supply Environmental Impact Statements and federal land exchanges for applicants and review agencies in Colorado and Texas. We also assist with smaller permitting projects, assisting clients with obtaining the necessary local and state permits, Environmental Assessments, nationwide 404 permits, and groundwater well permitting.

Example Projects

U.S. Army Corps of Engineers Hydrologic Modeling Guidelines

The U.S. Army Corps of Engineers – Fort Worth (Corps) contracted with DiNatale Water and Carollo Engineers to develop Hydrologic Modeling Guidelines (HMGs) for their Regulatory Permit Actions project. The goal of this project was to create more clarity between regulators and Applicants for the technical analyses required with an application for NEPA/404b. The potential impacts of granting a permit must be evaluated, and the amount of analysis necessary depends on the complexity of the system and the proposed project. The work performed by DiNatale Water includes a final report that outlines how the Corps evaluates these permit applications and a checklist that can be use by both Corps regulators and applicants.

Download the Hydrologic Modeling Guidelines Report

Download the Hydrologic Modeling Guidelines checklist

Halligan, Seaman, and Northern Integrated Supply Project Environmental Impact Statements

The Cache la Poudre River basin is one of the most heavily administered rivers in Colorado.  As the Third-Party Contractor for the US Army Corps of Engineers, DiNatale Water verified and updated a complex hydrologic modeling process to simulate water rights yields and realistic flows for the Corps permitting process. This entailed:

  • Rapid learning of the basin water rights and exchanges and understanding the impacts of increasing urbanization
  • Work with six inter-related models using MOSDIM and Excel-based platforms
  • Development of the draft hydrologic model review report for NEPA EIS
  • Collaboration with decision makers to modify EIS participant hydrology and water allocation models

DiNatale Water’s work resulted in a more complete understanding of the hydrologic system for use in the permitting process.  This analysis resulted in a technically defensible modeling process for use in three large water supply projects in northern Colorado.

Based on our work on this project, DiNatale Water has direct experience with and detailed knowledge of the Greeley System Model, the Poudre Basin Network, the Big Thompson Basin Network, and the Excel interface between the models (PPP, Greeley System Model inputs and outputs interface).

Lake Ralph Hall EIS Modeling

Lake Ralph Hall is a proposed 180,000 AF reservoir in northeastern Texas that would supply water to residents in the rapidly growing northern area of the Dallas-Fort Worth metroplex. DiNatale Water worked closely with the Army Corps of Engineers to ensure an independent analysis of the hydrologic modeling and the ability to use the modeling to assess impacts to a host of environmental resources in the basin. DiNatale Water also coordinated efforts between various regulatory agencies to ensure that existing or refined hydrologic modeling met the needs of all resources, thereby increasing the overall efficiency of the EIS process.